Kilawatt Technologies, Inc

Projects

GE Health Care - South Burlington VT
A 232,000 square foot facility utilizing a heat pump system and with a significant base load make up, in part, of multiple data centers. 


Reductions: Energy 21%

Cost 17%

In addition

  • Comfort complaints eliminated.
  • "Free" outside air cooling for one of their data centers
  • Director of Facilities reports building is significantly easier to manage

Homeland Security, Harvest Lane Williston VT
Fifteen year old facility, housing a Level 4 Homeland Security facility. Building systems control natural gas fired roof top units with VAV air handling system. At initiation of project significant occupant comfort complaints.


Reductions: Energy 20%
Cost: 15%
In addition:
  • Comfort complaints eliminated
  • Configured VAV operations to reflect occupant requirements. 

New England Federal Credit Union, Williston VT
31,000 square foot facility with significant comfort issues and no building automation system.  The HVAC system consisted of a single heat pump loop with natural gas fired boiler. 


Reductions: Energy 25%

Cost 21%

In addition:

  • Managed HVAC contractor, implementing fixed fee pricing for specific tasks. Only those Kilawatt verified completed did the contractor get paid for.
  • Optimized boiler controls and operations reducing natural gas burn by more than 50%
  • Developed four season sequence operations